Kvaerner Engineering & Construction (UK) Ltd

“The Rosebery Group have recently completed the E & I works for the Bridgewater Paper C.H.P. Plant in Ellesmere Port. They completed the project within the original programme, which was 27 week duration. Their approach was positive throughout and they performed well alongside the Kvaerner site team. We would be happy to work with the Rosebery Group in the future and would have no hesitation in recommending them for works of a similar nature.”
J.M. Sampson – Site Manager, Kvaerner

Project Details

  • Electrical and instrumentation design services
  • Electrical distribution systems
  • External lighting
  • Sub distribution and small power systems
  • Control panel build and installation
  • UPS systems
  • Site earthing system
  • Instrumentation and control systems
  • Stainless steel and copper impulse lines
  • 45 km instrument and control device cabling
  • 65 km electrical cabling
  • 4km tray and ladder rack
  • 300 field instruments
  • 30,000 man hours worked – no lost time accidents
  • 27 week project – completed on time and within budget
  • Client: Kvaerner Engineering & Construction (UK) Ltd. Stockton-on-tees
  • Location: Bridgewater Paper Company Ltd, Innogy Cogen
  • project: Barrow PM1 rebuild
  • Project Value: £££££ – electrical & instrumentation project